 |
|
| Since
the bulk head would be half way in the body tube, I
decided to install a metal plumbing fitting on the
upper side of the bulk head. I can then screw the
ejection charge into the bottom of this fitting from
below through the door for the altimeters. |

|
|
|
Here is the bottom side of the ejection
bulk head. The ejection charge is loading into this steel pipe and screwed into
the bulk head.
|
| I
applied West System epoxy to all of the leading
edges of the fins within the fin canister. |
|
|

|
Here
is another angle of the filets applied to the fin
canister for added strength, and to connect the
engine tube to the fin canister. |
<=Previous
Page Next Page =>
Jump to
Page 1 2
3 4 5
6 7 8
9 10
Copyright © John
Pretto 2000. All rights reserved
|
|